Pharmaceutical construction contractor · São Paulo Laboratories, plants and retrofit.

Eight published projects in the pharmaceutical sector, for Eurofarma, Aché Laboratórios, Allergan, Chiesi, Farmarin, Ceva Animal Health and L'Oréal — from a biosafety level 3 laboratory to a new innovation and biotechnology building.

Scope delivered

What has been built in this sector

Every line below describes work actually delivered, with the scope as published by Certek itself.

Laboratories

A brucellosis and PPD laboratory with biosafety level 3 for Ceva Animal Health, the Nanotechnology Laboratory (NILE) for Aché, a chemical and microbiological laboratory for Allergan, and the retrofit of Farmarin's atomic absorption laboratory.

Plants and expansions

Eurofarma's new Innovation and Biotechnology building in Itapevi, with support buildings, reservoir and paving, and the expansion of L'Oréal's Procosa unit, with a new production building, weighing and washing area, and tank dikes and bases.

Work inside an existing plant

Chiesi's Warehouse Revamping, with civil, electrical, plumbing and HVAC expansions and retrofits, and the visitors' panoramic elevator shaft with connecting walkway at Eurofarma's plant in Ribeirão Preto.

Delivered projects

Certek's pharmaceutical projects

Eurofarma Innovation and Biotechnology building in Itapevi Delivered

Pharmaceutical

Eurofarma — Innovation and Biotechnology

Itapevi/SP · 17,200 m²

New Innovation and Biotechnology building, support buildings, reservoir and paving in Itapevi (SP).

Completed blue visitors' panoramic elevator tower at the Eurofarma plant in Ribeirão Preto, Brazil. Delivered

Pharmaceutical

Eurofarma — panoramic elevator and walkway

Ribeirão Preto/SP

Construction of the visitors' panoramic elevator shaft and connecting walkway at the Eurofarma plant.

Granite lab benches in the completed laboratory at Aché in Guarulhos, Brazil. Delivered

Pharmaceutical

Aché Laboratórios — nanotechnology laboratory and utilities

Guarulhos/SP

Construction of the new cooling system and the Nanotechnology Laboratory (NILE), with waterproofing recovery and access control upgrades.

Aerial view of L'Oréal's Procosa unit in São Paulo, Brazil, showing production buildings and the lawn logo. Delivered

Industrial · Pharmaceutical

L'Oréal Brasil — Procosa unit expansion

São Paulo/SP

Construction and expansion of the Procosa unit, with a new production building, weighing and washing area, and tank dikes and bases.

Completed laboratory with biosafety cabinets and benches at Allergan in Guarulhos, Brazil. Delivered

Pharmaceutical

Allergan — Building 130 and new laboratories

Guarulhos/SP

Fill to Stage 2 project, construction of Building 130 and civil works for the new chemical and microbiological laboratory.

Aerial view of the Chiesi Farmacêutica plant in Santana de Parnaíba, Brazil, with warehouse and industrial buildings. Delivered

Pharmaceutical · Logistics

Chiesi Farmacêutica — Warehouse Revamping

Santana de Parnaíba/SP · 5,000 m²

Civil, electrical, plumbing and HVAC expansions and retrofits across the pharmaceutical and logistics areas.

Completed laboratory with benches, reagent shelves and technical flooring at Farmarin in Guarulhos, Brazil. Delivered

Pharmaceutical

Farmarin — atomic absorption laboratory

Guarulhos/SP

Civil, electrical and plumbing works for the retrofit of the atomic absorption laboratory.

Aerial view of the Ceva complex in Juatuba, Brazil, with industrial buildings amid green areas. Delivered

Pharmaceutical

Ceva Animal Health — biosafety level 3 laboratory

Juatuba/MG

Construction of a brucellosis and PPD laboratory with biosafety level 3.

Questions

What people usually ask us

Which pharmaceutical companies has Certek built for?

Eurofarma (Itapevi and Ribeirão Preto), Aché Laboratórios, Allergan, Chiesi Farmacêutica, Farmarin, Ceva Animal Health and L'Oréal Brasil. Janssen-Cilag and Johnson & Johnson are also among the clients served.

Does Certek build laboratories with biosafety requirements?

Yes. Delivered projects include the brucellosis and PPD laboratory for Ceva Animal Health, in Juatuba (MG), with biosafety level 3.

What is included in the handover?

Every phase: design coordination, planning and budgeting, construction with coordination of multidisciplinary teams and management of subcontractors, through to handover of a facility ready to operate.

Shall we talk about your next project?